Hardware

GPU servers, spares and integration - procured, built, commissioned.

From silicon to commissioning

GPU servers, spares and integration - procured, built, commissioned.

Explore hardware →

Company

Sovereign GPU cloud and infrastructure, built and operated in the Kingdom.

Servers & Parts

GPU systems, components and spares - procured, integrated, burned-in and commissioned on your floor or ours.

8-GPU server exploded-view render

42U Rack Elevation

A commissioned GPU rack, from the top rail down - compute, leaf switching, storage and dual-fed power, cabled and labelled to a documented elevation before it ever ships.

42U REF ELEVATION MGMT SWITCH - 1G LEAF SWITCH - 400G LEAF SWITCH - 400G 8× HGX H200 8× HGX H200 8× HGX H200 NVMe STORAGE NVMe STORAGE PDU A / B MGMT
42U RACK ELEVATION - REFERENCE GPU BUILD

Systems, Components & Spares

Whole GPU systems or the parts that keep them running - sourced through OEM partners, integrated and stocked in-Kingdom for fast turnaround.

GPU Systems

01
  • HGX/DGX-class platforms
  • OEM partner builds
  • Air & liquid cooled

GPUs & Accelerators

02
  • H100 / H200 / B200 / B300 modules
  • Upgrade paths

Networking

03
  • 400G/800G NICs
  • InfiniBand & Ethernet switches
  • NVLink bridges

Power & Cooling

04
  • PSUs
  • Rack PDUs
  • CDUs & manifolds

Storage

05
  • NVMe fleets
  • Parallel filesystem nodes

Spare Parts Program

06
  • In-Kingdom spares inventory
  • Advance replacement
  • RMA handling
0 Burn-In Standard
0 Typical Commissioning
0 Acceptance-Tested

Commissioning Timeline

A typical build runs roughly six weeks from signed quote to signed acceptance - spec, procure, rack, burn-in, and hand over against a documented test plan.

WEEK 0 WEEK 6 SPEC & QUOTE PROCUREMENT WEEK 1 RACK & CABLE WEEK 3 BURN-IN 72H WEEK 5 ACCEPTANCE